Health Advocate in Plymouth Meeting, PA

Health Advocate in Plymouth Meeting

Recently a Health Advocate in Plymouth Meeting, PA reached out to our team at AM Botte Commercial HVAC to provide a replacement of their heat pump HVAC system as well as new ductwork and air intakes. Health advocate could not close their business operations as they are staffed 7 days per week. Our team at AM Botte was able to perform all work at their Plymouth Meeting location during the hours of 6PM – 6AM, causing no interruption to their business operations. We replaced 6 heat pumps, installed 4 fresh air intake systems, all new ductwork with motorized dampers and wired the systems into their building automation control system. After the job was done we did a full clean up of the site leaving no remnants behind. The Health Advocate in Plymouth Meeting, PA, was ecstatic about the work done now knowing the building will now be fully operational with heating making the building the perfect temperature for everyone.

Highlights of Health Advocate in Plymouth Meeting, PA

  • Upgrade of 6 heat pump split systems
  • Replace 6 systems with new York heat pumps
  • Run all new power wiring and controls for new equipment
  • Run all new refrigerant lines through the existing building
  • Integrated the new units into the building management system
  • Install 4 new fresh air intake fans with all ductwork, motorized dampers and controls
  • All work was done 6pm to 6am after hours ensuring the medical space was un interrupted and clean each do so they were not disrupted
  • All work done in an occupied finished space above ceilings    

Photos of Health Advocate HVAC Replacement in Plymouth Meeting, PA

TLC Daycare In Voorhees, NJ

TLC Daycare in Voorhees, NJ recently hired AM Botte Commercial HVAC division to replace their entire 10 Ton AC system and 300,000 BTU gas furnace.  When TLC Daycare in Voorhees, NJ, reached out to us regarding their aging HVAC system, we knew we had a unique opportunity to demonstrate our commitment to client satisfaction and technical expertise.

The challenge was clear: TLC’s existing 10-ton AC unit and 300,000 BTU gas furnace were struggling to keep up with the demands of their facility. Replacing such a crucial system, however, would require shutting down operations, potentially impacting the daycare’s ability to care for children.

This was unacceptable. As a company dedicated to building trust and lasting relationships with our clients, we refused to let a necessary upgrade disrupt their essential services.

The problem TLC Daycare in Voorhees has was that they couldn’t close down their business while the repairs were being made. AM Botte managed to replace the entire ceiling-based, AC and Furnace system as well as run new ductwork in less than 48 hours from start to finish. Our teams worked around the clock to have TLC Daycare up and running by Monday morning.

Highlights of TLC Daycare in Voorhees, NJ   

  • Replacement of a 10 ton air handler AC system
  • Replacement of 300,000 btu induct gas furnace
  • All work was above a ceiling in the attic
  • Installed 2 York high efficient gas furnaces
  • Installed 2 York 5 ton AC units
  • Made new custom ductwork
  • Did all work over a weekend working around the clock

Photos of TLC Daycare’s 10-ton AC Unit & 300,000 Gas Unit

Retro Fitness Center in Glassboro NJ

Retro Fitness Center in Glassboro NJ

A.M. Botte recently renovated the HVAC system for the Retro Fitness Center in Glassboro, New Jersey, they had an HVAC system that was over 30 years old. The fitness centers aging, inefficient 10-ton HVAC system that no longer met their needs and was nearing the end of its lifespan, and the folks at the Retro Fitness Center in Glassboro, NJ knew it needed to be replaced.

Our initial assessment revealed a system struggling to maintain comfortable temperatures, resulting in energy waste and potential member dissatisfaction. Recognizing the importance of minimizing disruption, we proposed a comprehensive plan to replace the existing units with a modern Trane system while preserving the integrity of the recently installed roof and its warranty.

The project’s key challenge lay in achieving this objective without compromising either the performance of the new system or the warranty on the roof. Our solution involved the development and installation of custom metal adapter curbs, seamlessly integrating the new Trane units with the existing roof infrastructure. This innovative approach eliminated the need for roof modifications, ensuring both warranty protection and a smooth installation process.

The installation itself was a testament to our team’s expertise and dedication. The two 10-ton Trane units were meticulously positioned and connected, utilizing advanced piping and wiring techniques to optimize airflow and energy efficiency. The old system was decommissioned and removed in a controlled manner, minimizing disruption to Retro Fitness operations.

Upon completion, the results were immediate and impressive. The new Trane system delivered consistent, comfortable temperatures throughout the facility, significantly enhancing the member experience. Energy consumption demonstrably decreased, contributing to both environmental and financial benefits for Retro Fitness. The successful completion of this project underscores A.M. Botte’s commitment to delivering innovative, high-performance HVAC solutions that address the unique needs of our clients.

Retro Fitness is great BUT Retro HVAC systems waste energy. 

HVAC Replacement Retro Fitness Center In Glassboro NJ

South Jersey CML in Bellmawr, NJ

South-Jersey-CML-Bellmawr-NJ

South Jersey CML in Bellmawr, NJ is the Dunkin Donuts baking and distribution facility in South Jersey. Their location in Bellmawr is crucial to operations, as it is responsible for the on-time, on-budget of bakery supplied goods to its many member franchisees throughout South Jersey. A.M. Botte was tasked with the design and installation of: HVAC Uints, Exhaust Systems and Three New Cook Lines.

We have provided the best HVAC services to several industries in our 20 years of business. We can help you save time and money on your building project by being the sole contractor for your mechanical systems. We are able to keep costs under control by helping you avoid redesigns and multiple bids. After we are finished, we keep continuous communication between the client and our construction contractors.

We installed four new rooftop units with new ductwork for each one. In the kitchen, we put in three Stainless Steel Captiveaire Kitchen Hoods, and Stainless Steel Exhaust Ductwork. By the time the project was finished, we had put three new cook lines into service. 

Services Provides to South Jersey CML in Bellmawr, NJ

  • Installation of  FOUR New 15 Ton York Rooftop Units
  • All New Custom Ductwork for the Four Units
  • Installation of THREE new 40’ Stainless Steel Captiveaire Kitchen Hoods
  • Installation of 20” Stainless Steel Exhaust Ductwork
  • Installation of SIX, 3000 CFM Exhaust Fans
  • Installation of SIX Captiveaire Make Up Air Units
  • Put THREE New Cook Lines Into Service

Photos of South Jersey CML Project in Bellmawr, NJ

 

 

Waynesboro PA Post Office

Waynesboro PA Post Office

A.M. Botte performed a total upgrade of the Waynesboro, PA Post Office HVAC systems. We removed two old rooftop units and replaced them with new York high efficient units. We replaced the old boiler system with a new Burnham boiler and power flame gas burner, offering high and low fire for energy efficiency. We upgraded all the boiler pumps with VFD drives to help with efficiency. Once all the units were replaced,  we upgraded the HVAC controls for the entire building with a modern, building automation system (BAS). This allowed us to connect all the equipment to one central front end and monitor the building operation for maximum efficiency.

The Waynesboro Post Office now has a fully modernized system that will realize annualized savings of thousands of dollars.

Photos of Waynesboro PA Post Office Job

 

Abundant Life Church – Freehold, NJ

Abundant Life Church of God in Freehold, NJ recently added a new Christian Education wing to their church. The church contracted A.M. Botte to handle the design and installation of all the new ducts, HVAC units and building automation controls. The facility now meets the needs of this growing congregation in Freehold, NJ. 

Project Details for Abundant Life Church – Freehold, NJ

  • Ductwork for Kitchen, Foyer, Restrooms and Classrooms
  • Spiral Duct System for Multi-Purpose Room
  • High Efficiency HVAC Units
  • Multi-Zone Building Automation Controls

Photos of Abundant Life Church – Freehold, NJ

Time Lapse Video of Duct Installation